Vibration & Crack Monitor:

Before many projects can be carried out in New York City, surveying and monitoring must be completed prior to construction & must compliant with the TPPN 10/88 Technical Policy.

The Technical Policy and Procedure Notice # 10/88 (TPPN 10/88) of the New York City Department of Buildings (NYCDOB) requires for surveying and monitoring of all landmark buildings located on a 90’ radius of a job site in New York City. Vibration Monitoring Equipment and Existing Conditions Photographic Surveys are the steps and procedures needed to take when it comes to complying with this strict construction code.

 

Initial construction phases, primarily demolition and foundation work, are known to create and emit vibration shocks that affect nearby structures, where Landmark buildings, due to their years of existence, might well be significantly affected. As a result, building vibration and crack must be monitored.

 

Vibration Monitoring may, and is mostly used, for some of the following construction activities and/or scenarios by using Wireless Vibration Monitoring or Manned Vibration Monitoring:

 

  • Construction
  • Excavation
  • Demolition
  • Dynamic Compaction
  • Pile Driving

 

Monitoring is provided to ensure that no negative effects are caused by the construction process. Vibration and Displacement Monitoring are particularly critical when performing underpinning activities, site excavation, or other soil work as part of the foundation construction and design.

Data analysis and evaluation are performed immediately following data collection in order to calculate displacements. Vibration peak particle velocity is constantly monitored to immediately determine extents of movement and displacement relative to the predetermined criteria. The project team is notified immediately of any exceedance outside of the predetermined limits. Ultimately, KnF Team provides the client and the project team with the information necessary to conduct the project work in a safe, efficient, and cost-effective manner with minimized impacts to neighboring properties.

Contact us for more information or additional services:

Design & Expediting Services - Abu H. M. Kamal, PE 

SIA & Monitoring - Sunanda Pathiranage, PE, CWI, ICC, ACI

 

32-12 96TH STREET; SUITE 1

EAST ELMHURST, NY 11369

Phone 1: 212-729-9805

Phone 2: 212-729-4957

Fax: 718-521-5545
E-mail: iDOB@knf.nyc

Contact Us Today!

KnF Team:

Design & Expediting

Special Inspection 

Construction Monitoring

 

32-12 96TH STREET

E. ELMHURST, NY 11369

Phone 1: 212-729-9805

Phone 2: 212-729-4957 Fax: 718-521-5545
E-mail: iDOB@knf.nyc

Print | Sitemap
© Special Inspection & Material Testing - Powered by IONOS